Pathanamthitta> Moozhiyar Sabarigiri Hydropower Venture Kaki Dam Tomorrow night or the day after tomorrow
The Kaki Dam can retailer as much as 978.83 meters of water as per the present higher rule curve until October 20. KSEB had issued a purple alert after the water stage reached 978.33 meters at 10 pm final evening.

The higher rule curve stage is prone to be reached inside the subsequent 32 hours, relying on the present move price. The technical part of KSEB took all precautionary measures to cope with the scenario

If the hazard stage is exceeded, the spillway can be barely open and 25 cu.m. The water will attain Triveni after three hours if the water flows out of the Anathodu Dam the place the spillway of Kaki Dam is positioned.

Nevertheless, Alappuzha and Pathanamthitta districts will obtain mild rainfall as per the climate forecast. Due to this fact, the water stage within the river is just not prone to rise a lot. With the opening of the Kaki Dam, the water stage within the Pampa River will rise by solely 15 cm. Nevertheless, officers mentioned that bathing within the river, washing garments, fishing and fishing needs to be prevented because the move of water will intensify.

.

In case you have any considerations or complaints relating to this text, please tell us and the article can be eliminated quickly.

Raise A Concern