Most Recent

PM Modi inaugurates Haryana section of Dwarka Expressway in Gurugram

Gurugram: Prime Minister Narendra Modi inaugurated the Haryana part of the historic Dwarka Expressway in Gurugram on Monday.

18.9 km of the expressway, being constructed for about Rs 9,000 crore, is in Gurugram, whereas 10.1 km is in Delhi. Of this whole part, 23 km is elevated and about 4 km lengthy tunnel is being constructed.

Together with the flyover, an underpass can be being constructed to attach the Delhi-Gurugram Expressway to the Dwarka Expressway at Mahipalpur.

The 18.9 km Gurugram part of the expressway was accomplished final 12 months, whereas the remaining 10 km inside Delhi is predicted to be accomplished in just a few months.

The elevated eight-lane access-controlled expressway is the primary of its form within the nation. It consists of a singular 34 meter broad elevated highway supported by single pillars at a distance of 9 km.

Dwarka Expressway, also called Northern Peripheral Street (NPR), or NH 248-BB, is a high-speed, access-controlled freeway beneath building connecting Delhi to Gurugram. That is the primary elevated city expressway within the nation.

The expressway is predicted to scale back journey time between Delhi and Gurugram and increase growth in newly-developed areas.

The expressway begins from Shiv Murti on the Delhi-Gurugram Expressway and ends close to Khedki Daula Toll Plaza on the Delhi-Jaipur Expressway by way of Dwarka Sector 21, Gurugram border and Basai in Delhi.

The expressway will join key areas like Pataudi Street, Harsaru, Farrukhnagar and Sector 88 (B), bettering connectivity for Gurugram residents.

The expressway will even join Gurugram's Sectors 83, 84, 88, 99 and 113 with Dwarka Sector 21 and Indira Gandhi Worldwide Airport. It’s going to characteristic a completely automated tolling system.

The challenge will even be geared up with an clever transportation system (ITS), a toll administration system, CCTV cameras and monitoring mechanisms.

The Dwarka Expressway is being constructed in 4 phases overlaying totally different stretches, from Shiv Murti in Mahipalpur to Bijwasan (5.9 km), from Bijwasan Railway Over Bridge (ROB) to Delhi-Haryana border in Gurugram (4.2 km), From Delhi-Haryana border to Basai ROB in Haryana (10.2 km), and from Basai to Kherki Daula cloverleaf interchange (8.7 km).

Click Here To Join Our Telegram Channel

In case you have any considerations or complaints concerning this text, please tell us and the article will probably be eliminated quickly. 

Raise A Concern

Show More

Related Articles

Back to top button