Wednesday, September 28, 2022
HomeTop StoriesRailway dam damaged, residents of the area demanded repair.

Railway dam damaged, residents of the area demanded repair.

Merchandise: The Meteorological Division had already predicted heavy rains in numerous elements of North Bengal together with Kalimpong, Darjeeling. The utmost impact of rain since Monday night time was seen in lots of elements of Kalimpong and Jalpaiguri districts. Nevertheless, on the one hand, with much less rain since Wednesday night time, the administration has breathed a sigh of reduction because of the low water stage of many rivers in North Bengal together with Teesta, Jaldhaka, Diana, and then again, there may be nonetheless a sigh of destruction from many locations. The image is popping out. On Thursday morning, such an image was seen within the space adjoining to the Udalabari Ghees Rail Setu of the products division, the tough type of the Ghis river has precipitated quite a lot of injury to the railway dam. Residents of the native space advised that because of the rise within the water stage of Ghis river final night time, the guard dam of the railway bridge has been broken, in addition to this, the erosion of the dam continues to be occurring slowly. If the conventional dam is just not repaired, then the Ghis Basti adjoining space could also be within the grip of flood, our demand from the administration is to start out the work of dam building instantly.

.

Click Here To Join Our Telegram Channel

You probably have any considerations or complaints relating to this text, please tell us and the article will likely be eliminated quickly. 

Raise A Concern

RELATED ARTICLES
- Advertisment -

Most Popular